gues
JOHNSTON ATOLL

SCIENTIFIC

F &S NO.

TITLE

01121

Laboratory Space

USER

STRUCTURE/FACILITY NO.

Univ. .of
Wash.
FUNDING

AGENCY

SCIENTIFIC STATION NO.

None

60D

None
FOD

($000)

AEC

ENGR

|

PROC

CONST

TOTAL

FURN

;

TO BE DETERMINED

PROPOSED
ENGINEERING
PROCUREMENT

To be determined.
To be determined.

CONSTRUCTION This facility will require a minimum of 200 square feet of

laboratory space, 16 cubic feet of reefer space at 0° F, and 12 cubic feet at
35° F. Power requirements will be 5 kw at 110 volts, 60 cycle. Dry storage.
of 1,000 cubic feet will also be required. Space requirements are not finalized,
however, this facility will utilize existing space if available.

-

VOLI

April 1969

Select target paragraph3