JOHNSTON ATOLL
F &S NO.

01075
USER

AFTAC
FUNDING
AGENCY
USAF
MIPR

67-4

SCIENTIFIC

TITLE

Underground Bunkers
STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

204 and 205
($000)

91-11-1 and 91-11-2

ENGR

PRE-GO
Prior Cost

POST-GO
Est. 8/68
TOTAL

BoD

PROC

CONST

1.4

FO0 GO+120
FURN

TOTAL
1.4

52.0
1.4

52.0

52.0
53.4

PRIOR YEARS
ENGINEERING Completed.
Drawings:

91-205-AM1

91-205-CElandCE2

91-205-E3

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION

Existing Bunker 204 and 1/2 of Bunker 205 will require

modification and rehabilitation for use as scientific stations. Two AFTAC
furnished technical trailers will be located west of Bunker 205. New air
conditioning units will be installed in both bunkers. Bunker 204 will require

15 kw and Bunker 205 will require 20 kw of 120/208 volt, 60 cycle, 3 phase

scientific power. An additional 20 kw of utility power will be provided to
each bunker. Power receptacles will also be provided for the two technical
trailers.

1-69

VOL I

Select target paragraph3