JOHNSTON ATOLL

SCIENTIFIC

01065

Page 2

PROCUREMENT Completed.

CONSTRUCTION New coaxial cable will be installed on the tower. The tower
will be structurally modified to accommodate the additional loads imposed by
the larger coaxial cable runs, the boresight target, and the bracket sensors,

and signal cable for the Low Level Wind System. This tower is utilized as
Tower No. 1 in the Low Level Wind System. (Refer to F&S No. 01126).
Includes $630 funded by PMR and $420 funded by JTF -8.

**Includes $345 funded by PMR and $230 funded by JTF-8.

1-61

Diatal

VOL I

_ April 1909

Select target paragraph3