PROGRAM 437
Page 2
81013
FY 1969
e
ENGINEERING: Com pleted.
Drawings:
JS 91-120-A114 thru All6
JS 91-120-M108 and M110
JS 91-120-E114 and E1LI5
PROCUREMENT Completed.
CONSTRUCTION The building modifications scheduled for FY 1969 provide
for the enlarging of the LOX Clean/Preclean Laboratory area at the expense
of the Mechanical Maintenance Room.
*Costs indicated are for the modifications only and do not reflect the original ©
rs
7
te
MER ah geet
cost of the building.
81-17
VOLI
April 1969