SECTION IV
FACILITIES
GENERAL
This volume contains a compilation of field construction and major
modifications which have been completed, are underway, or are
proposed for accomplishment on Johnston Atoll in support of Pacific
Test Operations. Included is an index of scientific, support and
communication facilities, plus individual narrative descriptions
that provide detailed information pertinent to each project or
facility.
Support facilities not directly related to Test Operations, but which
are vital to programs other than the nuclear weapons test program,
are also included in this publication.
TABULAR LISTING OF FACILITIES
The numerical index of active facility numbers, Table 5-1, isa
listing by F&S Number according to intended use.
The F&S Item
Number of facilities which have been consolidated or are no longer
required have been omitted from this listing and are on record
with the Logistics Planning Group (LPG).
NARRATIVES AND DETAILS
The information concerning each project or facility is presented
in F&S Number sequence, with the exception of MILCON base
support facilities which have not been funded; these are listed
separately.
The facility and project descriptions in this volume
are presented on various colored pages to emphasize their status
as follows:
White Pages - Projects for which all requirements scheduled to be accomplished are completed. If additional
work to a completed project or a new project is required
for a future fiscal year or after 'GO", and if problems
as to funding and/or scheduling are not anticipated, said
project is so indicated on a white page.
Yellow Pages - Projects for which a requirement has
been indicated formally by the User agencies but which,
for various reasons, funding, engineering, procurement
and/or construction have not been authorized by either
AEC or DOD. Projects which have been deferred, or
VOLI
April 1969