JOHNSTON ATOLL
SUPPORT
02029
Page 2
A wo
The electrieekequipment building (Building 266), is an 11 x 7 1/2 x 9-ft. high
concrete black structure with concrete floor and roof.
(Completed in 1965.)
A 26 x 40 x 12-ft. high metal frame structure (Building 267) with corrguated
aluminum roof and open sides shelters the lube storage area.
in 1967.)
(Completed
An 11 x 40 x 8-ft. high metal frame shelter (Building 269) with corrugated
aluminum roof and siding houses the POL Pump Complex. (Completed in
1966.)
FY 1969
ENGINEERING In progress.
PROCUREMENT In progress.
CONSTRUCTION fire extinguishing foam system will be installed atop the
POL storage tanks.
2-27
VOLI