““postSandstone Requirements and Responsibility for

the Eniwetok Proving Ground

Under consideration was a study on the above subject
prepared for the Joint Chiefs of Staff by Joint Task Force 7.

BA

oe

iS

~\

The General Manager stated that the three services had approved

&
4

~,

the report and had requested concurrence of the Atomic Energy

Commission in the Appendix, a draft instruction from the Joint
Chiefs of Staff to the Commander in Chief,

Pacific.

Mr.

+

“J

NY

Volpe

inquired whether the proposed instruction had been discussed
General McCormack stated that

he understood that the instruction had been cleared by the
Department of State.

After discussion,

the Commission:

re te

CONCURRED in the Appendix to AEC 9/8.

i
ss
a
on

te.

with the Department of State.