PILE DRIVING:
05.

All piles shall be driven within 3 inches of the locations

defined on the drawings,

The piles mst be driven not more

than 1/8 inch per foot from vertical, and the tops shall be
driven to within 2 inches of the indicated elevations,
06,

All piles are to be driven their full 50~foot length below
cut-off grade.

O7.

in event that either

(a) refusal is met before the piling is driven to grade,
or

(b) the average driving resistance during the last 5 feet
of driving is less than 25 blows per foot,
this fact and all pertinent observations of driving behav-—
ior, including the complete driving record, should be immediately commnicated to the design office,

08.

Jetting may be employed if necessary to secure the desired
tip elevations,

However, the jet mst be withdrawn and the

piles driven with the hammer alone for the final 5 feet of
penetration,

RECORDS:
09.

The tip elevation for each pile driven shall be recorded.

10,

The blows per foot of penetration shall be recorded for
all piling during the last 5 feet of penetration; for 20

FIGURE 5.%6, (Continued.)