per cent of the piling these data shall be recorded during the entire period of driving.
INSERT PG1s:
li.

The embedment of this piling has been chosen, based on an
analysis of the properties of the soil, so as to provide

the desired design capacity,

It is not intended that a

dynamic formula be used in the field to select or modify
the desired depths of penetration of the piling.

FIGURE 5,%6. (Continued,)
5-87

Select target paragraph3