1 Oo
7
™
ra
HOLMES
omer
mY
tL
wd
RES %
& NARVER,
INC
ENGINEERS - CONSTRUCTORS
JOB 942
NAME OF STAT:ON
CHIEF OF FARTS
OF
TRIANGULATION
HRNRY
S’) rf
FF. A. Axtell
PAGE
CiSTANCES
CBECT |
pate June 1957
AND
DIRECT: NS
DISTANCE
FEET
‘Marshall Islands
REFERENCE
|
Rigili #2
ELEVATION
6.54
00-00-00
—
P.I. #1
«147.35
275-20-33
7.72
P.I. #9
- 560.33
1442-49-13
11.64
DETAILED
——-
MARKS
—
ELEVATION
OF MARK
OGESCRIPTION
6.54
OF
STATION’
This station was established as a third order triangulation station in the Atoll
E<
Control Net by the Holmes & Narver 1957 Expansion Survey
“a
&
“= =
: a
2 go
=m
%| 2
= 3
Be
=
This station is located on the north east portion of the island approximately
50 feet south of the lagoon high tide line.
The station mark is a standard H & N brass cap set in concrete 1 foot below
the ground surface.
It is stamped "Henry - H & N - 1957."
P.I.'s #1 and #9 are 1"%x3" flats marked with stake tacks. The flats are
driven flush with the ground surface.
graphic control traverse.
They are F.I.'s in the Island topo-
=
48
S
2
.
Eniwetok Atoll.
DIRECTION
METERS
Henry
ig
.
TO
BENRY
Mui Island
CESCRIBED BY W. Creasman yarkep wY Fe A. A.
FIELD BOOK NO
STATION
=
2vo
oy
J
¢ x3
od
at
DESCRIPTION
|