SECTION 7 MISCELLANEOUS METAL WORK 7-Ol. SCOPE: The work covered by this section of the specification consists of furnishing all labor, materials, equipment, and transportation required to complete the miscellaneous metal work as indicated on the drawings or required for the work, 7-02. CODES: The provisions of the following codes and specifications shail govern the work insofar as these provisions are applicable: a. American Institute of Steel Construction publications (latest revision). 1. Code of Standard Practice for Steel Buildings and Bridges. 2. Specification for Design, Fabrication and Erection of Structural Steel for Buildings. b. edition). American Welding Society Code (latest 1. Construction. Are and Gas Welding in Building 7-03. INSPECTION AND TESTS: 7-04. PAINTING: Mill inspection and tests will be waived if certified mill test reports accompany deliverles and all heat marks are legible. Refer to paragraph "C", sub 4 of Section 10 on Painting. Paint shall be applied only to thoroughly dry surfaces and coverages shall be even, full, and without runs or sags. 7-05. GENERAL: Supplementary parts necessary to complete each item, though such work is not definitely shown or specified, shall be incluced. Standard commercial products which meet the general requirements of the drawings and specifications and vary only in non-essential detail will be acceptable, the approval of the Contractor, 7-06. GUARD BARS: subject to Shall be provided for openings in locations shown and as detailed. 7-1 Bars with