d.
Operation of Stations station shall be under the supervision
physician, who will issue instructions
ing practices, procedure and equipment

Each first-aid
of a qualified
regarding operatfor stations under

his supervision.
Ambulance service or facilities as
well as adequate means of communication as determined by
the supervising physician shall be provided.

III-9 TESTS OF PRESSURE VESSELS - Any boilers or
other pressure vessels furnishedby the Contractor under

these specifications which will be operated at pressure

of 15 pounds per square inch or greater shall be delivered bearing a certificate of shop inspection by a reputable
testing agency. After installation and prior to acceptance
by the Government such boilers and pressure vessels will
be tested in a manner which is the standard practice
for such tests.

All boilers or pressure vessels which will be operated at

pressures of 15 pounds per square inch or greater and will

be used by the Contracter in his operations in the projJect area will be similarly tested, approved and certified
before being brought on the project and shall be tested
annually thereafter.

ITI-10

TESTS OF INSTALLATIONS - All work on the Project

involving utilities or other installations will be tested
as required to assure conformance with the drawings and
Specifications as approved by the Commission.
Operating
units shall be tested as required to assure proper opera-

tion. Rough-in tests of utilities shall be performed before the installation is concealed in the walls, floors,
or otherwise and before the service ts connected into the
distribution or collection systems. All such preliminary
tests shall be performed in the presence of a responsible
representative of the Contractor as provided for in the

Contract. Final tests of the installations will be made
in connection with the inspection for acceptance of the
construction and shall be performed in the presence of
representatives of the Contracting Officer.
The final
tests will govern and deficiencies which may develop between the time of the rough-in test and the final test

will be corrected prior to final acceptance.

GC-IV
IV-1

ACCOMPLISHMENT OF WORK - ADMINISTRATION
MATERIALS AND EQUIPMENT:
a.

Shop Drawings - The Contractor shall check