SECTION 20
INSTALE.TLON OF BOUIPMaT AND PIP DIG
FOR
POUDR kD WATER DIST.ULTION PANT
20-01,

GEMNERAT, PECUSREMENTS :
a.

The work covered by this section of the specifi-

cations consistsof“urnisi.sng all labor, materials, tools

and equipment required, and in performing all operations in
connection with the installation of the power and water distillation plant as indicased on the drawings.
b.

Excavation aad backfilling shall conrorm to the

¢.

Concrete “ork,

d.

Fresh and Salt Vater pipirg in this section shall

@.

Plumbing

"Earthwork for Utilities’ section of These sp2ei fications.
in this section,

shall conform to

the provisions of the "Concrete and Form "fork" scetion of
these specifications.

conform to the provisions of the "Fresh and Salt “ater Distribution System" section of these specifications.
in this section shall conform to the

provisions of the "plumbing" section of shese specifications.
20-02. “IORKMANSHIP: All work shall be executed in a workmanlike manner and shall present a neat appearance when com-~
pleted,
20-03.

APPLICABLZ SPECIFICATIONS:
a.

Federal Specifications:

"NieP-O5

Pipe;

Steel and Ferrous Alloy

(for)

WW-P-21

Pipe;

Water, Cast-Iron (Bell and

Ordinary uses (TIron-Pipe-size)
Amendment #1.

with

Spigot and Bolted Joint) with Amend-

ment #3,
viy-Pelila Pipe;

“'rought Iron, ‘velded,

Zine-coated with Amendment

"*'=P-521b Pipe-Fittings;
150-pound,
20-1

Black and

#2.

Malleable-Iron (screwed).

Select target paragraph3