ed aluminum facing bolted to a steel frame.

Sliding

door hardware shall be manufacturer's standard,
Wilcox or equal.

2.

Richard-

Swing doors shall be manufacturer's

standard tubular steel doors and shall be furnished complete with hardware, including cylinder locks and astragals.
Upper door panels shall be glazed with wire glass.
f.

Hardware:

1.
Rough hardware, including all bolts,
nuts, metal washers and miscellaneous shall be either 34

hot dipped zinc coated, (2) zine dichromate plated or
aluminum. Building manufacturer shall furnish anchor
bolt setting drawing.
2.

(3

Finish hardware for building and manu-

facturer's items shall be as hereinbefore described and
for wood doors and other items not furnished by building
manufacturer shall be as specified in the "Carpentry and

Related Work" section.
g.

Painting:

All structural steel shall be shop

prime painted with one coat of a red lead paint standard

with the building manufacture.

After erection abraded

surfaces shall be touch up with a similar prime paint.

Finish painting shall be as specified in the "Painting"
section.

h.

equipment,

Weatherproofing:

After installation of

the sliding doors at the north and south ends

of the building shall be permanently secured and weatherproofed. Voids at perimeter of openings shall be filled
witn wooden blocking or filled in other approved manner
in preparation for application of vapor-seal coating

(Refer to "Painting" section).

Refer also to "Carpentry

and Related Work" for further weatherproofing provisions.
13-05.

EQUIPMENT:

The following is a partial list of

equipment required for the erection of metal buildings.
Contractor shall furnish all equipment and tools required
for the work.
a.
Scaffolding,
ladders and planking.

3/8").

b.

including saw horses,

Screw drivers and socket wrenches,

step
(up to

Air or electric tools may be substituted if desirec
13-7