ed aluminum facing bolted to a steel frame. Sliding door hardware shall be manufacturer's standard, Wilcox or equal. 2. Richard- Swing doors shall be manufacturer's standard tubular steel doors and shall be furnished complete with hardware, including cylinder locks and astragals. Upper door panels shall be glazed with wire glass. f. Hardware: 1. Rough hardware, including all bolts, nuts, metal washers and miscellaneous shall be either 34 hot dipped zinc coated, (2) zine dichromate plated or aluminum. Building manufacturer shall furnish anchor bolt setting drawing. 2. (3 Finish hardware for building and manu- facturer's items shall be as hereinbefore described and for wood doors and other items not furnished by building manufacturer shall be as specified in the "Carpentry and Related Work" section. g. Painting: All structural steel shall be shop prime painted with one coat of a red lead paint standard with the building manufacture. After erection abraded surfaces shall be touch up with a similar prime paint. Finish painting shall be as specified in the "Painting" section. h. equipment, Weatherproofing: After installation of the sliding doors at the north and south ends of the building shall be permanently secured and weatherproofed. Voids at perimeter of openings shall be filled witn wooden blocking or filled in other approved manner in preparation for application of vapor-seal coating (Refer to "Painting" section). Refer also to "Carpentry and Related Work" for further weatherproofing provisions. 13-05. EQUIPMENT: The following is a partial list of equipment required for the erection of metal buildings. Contractor shall furnish all equipment and tools required for the work. a. Scaffolding, ladders and planking. 3/8"). b. including saw horses, Screw drivers and socket wrenches, step (up to Air or electric tools may be substituted if desirec 13-7