coat,

(c)

Third coat shall be same as second

except apply unreduced,

10.

or approved equal.

Airfield Center Line:

Center lines and/or

cross marks shall be provided for Airfield runways as
called for on the drawings.

(a)

Paint to be used shall be spraying

(bo)

Lacquer shall be applied only when the

grade traffic line lacquer of the color furnished by the
Owner.
surface is dry and broomed free of small particles of sand
and dust. After preparation of the surface, lacquer shall
be applied at the rate of approximately one gallon (1 gal.)

per one hundred and twenty square feet (120 sq. ft.) of
surface.

(c)

Equipment:

Application of the lacquer

shall be with approved
traffic line spray equipment or hand
spray guns provided suitable guides are used to produce a
line of uniform width, with sharp, neat edges.

10-08,

DRYING TIME:

A minimum of three (3) days drying

time between coats shall be sufficient to allow thorough

drying of the paint, and shall not be less than 24 hours.

All undercoats shall be tested with hard pressure of the
thumb to be sure they are dry.

10-09.
PROTECTION AND CLEANING:
Oily rags or cotton waste
shall not be stored inside buildings or allowed to accumulate on the premises.
Upon completion of the work all
scaffolding and paint containers shall be removed from the
site or destroyed in a manner approved by the Engineer.

Paint spots, oil or stain upon adjacent surfaces shall be

removed and the work left clean and acceptable to the Engineer.

10-10