SECTION 10
PAINTING
10-01,

GENERAL REQUIREMENTS:
&.

Scope:

The work covered by this division of

the specifications consists in furnishing all labor, tools,

equipment and scaffolding required for all painting and

finishing shown on the drawings, hereinafter specified or

required for the work.

Surfaces to be painted,

hereafter noted or directed by the Engineer,
follows:
b.

except as

shall be as

Interior Painting:
1.

ete.

<All woodwork,

including:

(a)

Doors and door frames.

(b)

Window sash.

(c)

Plywood walls, ceilings and partitions.

(a)

Moulding and trim,

(e)

Exposed studs and sheathing.

(f)

Exposed roof construction.

(g)

Finish flooring.

tn)

Benches,

shelves,

counters,

cabinets,

2. Aluminum walls and ceilings where called
for on the drawings.

c.

3.

Piping - steel and iron pipe and fittings.

4,

Piping - insulated pipe and fittings.

5.

Equipment not furnished with finish coat.

6.

Ferrous Sheet Metal Work.

Exterior Painting:

1.

Woodwork,

including:
10-1

Select target paragraph3