SECTION 10 PAINTING 10-01, GENERAL REQUIREMENTS: &. Scope: The work covered by this division of the specifications consists in furnishing all labor, tools, equipment and scaffolding required for all painting and finishing shown on the drawings, hereinafter specified or required for the work. Surfaces to be painted, hereafter noted or directed by the Engineer, follows: b. except as shall be as Interior Painting: 1. ete. <All woodwork, including: (a) Doors and door frames. (b) Window sash. (c) Plywood walls, ceilings and partitions. (a) Moulding and trim, (e) Exposed studs and sheathing. (f) Exposed roof construction. (g) Finish flooring. tn) Benches, shelves, counters, cabinets, 2. Aluminum walls and ceilings where called for on the drawings. c. 3. Piping - steel and iron pipe and fittings. 4, Piping - insulated pipe and fittings. 5. Equipment not furnished with finish coat. 6. Ferrous Sheet Metal Work. Exterior Painting: 1. Woodwork, including: 10-1