be equipped with at least 1/2" insulation over bolt work,

mounted on fusible studes, thermostatically controlled,
designed to automatically seal opening at door frame when

temperature reaches approximately 165° F. The door shall
be equipped with five 3/4" diameter bolts, operating four
to the front,

and one to the top, with interlocking tongue

and groove at top, front and rear, checked by threetumbler, hand changed, bronze case combination lock, with
spindle shouldered against lock plate to prevent driving,
and two hard pins in spindle to prevent drilling. Entire

locking mechanism to be guarded by 1/4" drill-resisting

plate.

The door shall be equipped with "Emergency Escape

Device’, having auxilliary inside handle, a turn of which

will permit immediate escape of anyone locked in the vault.

ec.

Finish:

The door shall be finished in wrinkle

green, ornamented with gold striping.
Jambs smooth green.
Hinge tips, combination dial knob, rim and exposed portion

of bolt handle, heavily nickel-plated.
Numbers on combination dial in white against black enamel surface.
Door
shall be finished as specified above or shall have an
equivalent factory finish.
9-10.

STEEL PLATE DOOR:
a.

Where so indicated in the Administration Build-

ing at Location "B", the vault door shall be steel plate

hung in a steel frame with hinges and handle hasp in accordance with the details as indicated on the drawings.
b.
Frames, not otherwise detailed shall be construct
ed of hot rolled steel shapes provided with a strap anchor
welded to the back of angles.
Corners shall be mitred,
fitted close and welded.

c.

Where door contacts door stop provide mask felt

ad.

Door frame and hardware shall be provided as

strip secured to door with brass machine screws.

indicated in paragraph 9-06 e. of this specification.
9-11.

ALUMINUM WINDOWS AND FRAMES:
a.

General:

Contractor shall furnish and install

fixed aluminum windows and frames where indicated on the

drawings.

b.
Materials:
as follows:

Unless otherwise indicated shall be

9-4

Select target paragraph3