In gencral, the garrison phase from 17 November

1952 to 31 Hay 1953 was one of rehabilitation and maintenance of

5

.

cquipment.

Sone now cquipment was installed, but this served chiefly

as an improvement to current fad lities rather than an increase in

* the communications nctwork of the PPU.
|

' During the build-up and carly operational phaae of CASTLE,
the following major chances in facilities were planned and carried out:
a.

A major modification of Building 15 to provide a relay

eenter with on-line ercryption on tho major circuits, a facilitios con1

trol, an extension on the crypto vault, and a new dial exchange,
‘
f

b.

An extcnsicn on the Joint Trensmittcr Buiiding T4, and

instal” ation of additional transmitters and construction of additional
antonnis,

C

“

.

Expansion of the telephone cable plant.

d.

‘Tho installation of Comeenters at Site TARE, andNaN in

support of AEC operctions, and the Anstallation of Comconters at Head-

4

. quarters [TF SEVEN at ELLER and Headquarters, 16 7.2 at PRED,

ee
ar

Ce

.

.
,

whee

At the start of the ‘CASTLE Operation, the ‘detailed List
of Signal facilities was quite dence, and is attached forr information, .
w

30

Opersticnss

.

sie BS oo oon on oe
Rot

After it, the Communications Sect:n ado proparations for

oy

.

the disposi tion of commund.ca ion ‘equipment deemed to be in excess to.
requiredents for“garrison éperations Upon,completion ‘of this activity,
“coraindeat or a
| ctivities wore purely routine until the beginning of
“¢

“ae

the build-up phaeo
AP oy NN to

oy a

Select target paragraph3