Oo low as consistent with the emergency. CTG 7.1 agreed to alnimize tho requirement, but steted thrt the problem would continue indefis nitely. CUTF (uVEN then ordered that communication personnel would not be uscd on redsafo monitoring activitics. it becamo nocessary to trein more sackeup monitirs to feplace the non-availability as redsafe monitors of communications persennel and other enlisted men who wore necessary for efficient functioning of T 7.2. Accordingly, during the period 1'/-22 Larch 1954, 29 more back-up monitors were trained, and during the period 13-14 Joril 1.954, 10 more. back-up monitors were trained, The requirc- ment coeclined steadily after KOON and by NECTaR only 17 monitors were * on TDY to TG 7.1, A recommendation concerning this matter has been placed into Section XVI of this report, . = In order to conduct the radiological safety orientation 36 of 21] TG 7,2 personnel, a training program wes instituted. this indoctrinition training wes given to all members of the command by the unit radsefo officers, and repeited for replacement’ personnel ater, a , ‘ cageee ee Ne Tho Tesk Group laundry maintnined three nebile Aeundry units, These were installed in rear of the leundry building, and | previsions were mado to drain contaminited waste w.ter directly into the lagoon. These units have successfully completed the mission of previding cont:aninated clotning laundry facilitics to mG Tele Arca nunber ‘7, a barbod-wire enclosed compound, was elloted to 1G 7.1 as o contaminated equipment storage arca, This area > proved to be satisfectcry thus fulfilling the edditional mission — asoigned ty CUTF SEVEN Opcration Order 3-53. wre Sonar 5 nacre 36-Tab CC : re oe greeeee ate eee tt te ht a 8 ee enaeons , rod.