Oo

low as consistent with the emergency.

CTG 7.1 agreed to alnimize

tho requirement, but steted thrt the problem would continue indefis
nitely. CUTF (uVEN then ordered that communication personnel would
not be uscd on redsafo monitoring activitics.
it becamo nocessary to trein more sackeup monitirs to
feplace the non-availability as redsafe monitors of communications
persennel and other enlisted men who wore necessary for efficient
functioning of T 7.2.

Accordingly, during the period 1'/-22 Larch

1954, 29 more back-up monitors were trained, and during the period
13-14 Joril 1.954, 10 more. back-up monitors were trained,

The requirc-

ment coeclined steadily after KOON and by NECTaR only 17 monitors were *
on TDY to TG 7.1,

A recommendation concerning this matter has been

placed into Section XVI of this report,

.

=

In order to conduct the radiological safety orientation

36

of 21] TG 7,2 personnel, a training program wes instituted.

this

indoctrinition training wes given to all members of the command by

the unit radsefo officers, and repeited for replacement’ personnel
ater,

a

,

‘

cageee ee Ne

Tho Tesk Group laundry maintnined three nebile Aeundry
units,

These were installed in rear of the leundry building, and |

previsions were mado to drain contaminited waste w.ter directly into
the lagoon.

These units have successfully completed the mission of

previding cont:aninated clotning laundry facilitics to mG Tele

Arca nunber ‘7, a barbod-wire enclosed compound, was
elloted to 1G 7.1 as o contaminated equipment storage arca, This area >

proved to be satisfectcry thus fulfilling the edditional mission —

asoigned ty CUTF SEVEN Opcration Order 3-53.
wre
Sonar
5 nacre
36-Tab CC

:
re

oe greeeee ate eee tt te ht a 8 ee enaeons

,

rod.

Select target paragraph3