oN SECTION V - LOGISTIC: S4 activiticss: rr a l, ae Missions The Sy exercised staff supervision for the planning and coordinatic n of activitics purtaining to procurzrent, supply, hespitnalizetion «nd cvacurtion, trensportvtion, and services, including maintenance ind repair of supplics and equipent, end construction of facilitics and instrllations. be Generals with the conclusion of Operation IVY, the Logistics Suction was concerned primcrily with the roll-up of supplics and cquipacnt which had accumulated during IVY. To this extent, all supplics and equipment which had generated in cxcess to the needs of the Task Group © were procossed, renovated, and placed in storage or cocooned in place 2s was Ccemsd noccessary. ¥r IVY roll-up progressed smoothly until 29-30 Dectsber 1952, when Typhoon HESTER strick ENIVETOK aTOLL, causing extunsive daaige to tent areas, roads, buildings and materials, This disaster temporarily halted the roll-up missions inasmuch as 211 efforts were diverted toward the rehabilitation of facilitics and installations damaged or destroyed. The rchabilitation project wes of such .ognitude that its completion wis not effected until 30 Juno 1953 Despite the adacd problers proscented by Typhoon HESTER, IVY roll-up was corpleted in a satisfectory manner, . In carly spring of 1953, CJTF SEVEN instructcd CTG 7.2 on to subsait a five year construction plin for ENTWeTOK ISLAND. 15- Repert on Typhoon HESTER, Hos TG 132.2, dat.d 15 Jan 53. @ «) lé=~ Tab N 17- Tab 0 . e The