7
FROJECT
STARTED
COMFL
3 May
100%
130.Hot Water Reaters Electrical end
Water Heaters
8 Apr
bop
131. Swinners Tavern
Fetio
Aggregate
1 Mar
100%
15 Mer
132. Plidg 90
Motal sheeting
13 Fed
100%
6 Mar
133. Radar Towor
Lumber
28 Mar
100%
3 Apr
134. Aircraft Hangar
Window Glass
15 Feb
100%
15 Mar
135- Fost Motor Fool
Ventilators
Elec Fower
ERCS:CT NUMBER
129. Mess Hall
Bldg 93
ze
3
Faint
roofing
REx
REATKS
AEC rrovidod material:
Arzy labor.
Rot weter heaters rocoived froa
ZI by ESN 29 Juno 53.
75%
Ventilators have been installed.
Installation of olectrical work for
explosive rroff lignting io progress.
136. Electric Fower,
15 Feb
100%
5 Mer
137- Demolish Bldg #133
20 Jap
100%
5 Mar
138. Gorerators
5 ver
96%
139. Ropair LCi $48
16 Mar
100%
18 Mer
140. Wire fence transformer
5 Mar
100%
7? Mar
141. AF Coofurence Room
13 Apr
100%
24 Apr
FRawivoesonde Aroe-
14
ASC provided raterials
Aray lebor.
Work io pregress %0 lest unit.