(5)

Survey Project Field Director.

A DOE employee,

embarked in USNS WHEELING, will be designated the DOE Survey
a)

Project Field Director

agenininesaieasennnnietata

(SPFD) and will have responsibility

for on-site technical direction of the survey.

He will

direct the efforts of all DOE and DOE contractor personnel
and will make requests for Navy-provided logistics support
from the LSTC.

He will be responsible to the designated DOE

Survey Project Manager

(at NVOO)

for the survey results.

To

this end, the SPFD will develop detailed survey work plans
in coordination through the LSTC.

He shall be responsible

for determining requirements for helo lift, support ashore,
duration of stay at each location, and other requirements
affecting mission performance, all within an agreed overall
resource availability.
d.
7.

A diagram of organizational relations is at Appendix III

j|§EMPLOYMENT AND OPERATION OF USNS WHEELING

COMSCPAC,

(TAGM-8)

(TAGM-8) .

on behalf of COMSC, will operate USNS WHEELING

in accordance with reference

and U.S. Navy Regulations.

(a), current directives,

Sponsor/Operator relationships

will be as defined in reference

(b).

ark

8.

RADIOLOGICAL SAFETY,

HEALTH AND DECONTAMINATION.

The DOE

will assume primary responsibility for all matters pertaining
to radiological safety, health and, where required, radiologica’
decontamination.
a.

DOE will monitor all radiological hazards and safety