POL FACILITIES PARRY AND ENIWETOK
RECOMMENDATIONS FOR BETTER OPERATION AND SAFER OPERATING CONDITIONS

6.

Guard Posts,

The piping above the ground near the service station should be
protected by posts to prevent their being struck by passing

vehicles.

See FS 609,

Drainage from Tanks.

A drainage manifold should be installed at each set of tanks
to facilitate the flow of drainage to the lagoon or into 4
dry well.

The present method of individually draining each

tank to the ground creates a fire hazard,

The installation

of a suitable drain manifold will eliminate this hazard.
See FS 611.

Dikes.
Suitable stairs should be installed over the dikes at points
where it is necessary for the workmen to use while performing
his duties.

This would prevent the dikes being damaged as is

the case at present.

See FS 610.

Also, the dikes have not been sufficiently stabilized,
as natural erosion is destroying them.

Additional bituminous

oil should be sprayed on the dikes as required.
P

era

Valy

At present it is necessary to shut down both dehydrators when

repairs are required to the pilot operated motor valve in the
fuel outlet lines.

By moving the valves V8 and V9 down stream

2-13

Select target paragraph3