STANDARD OPERATING INSTRUCTIONS NO. 2

MAINTENANCE AND OPERATION INSTRUCTIONS FOR
POL FACILITIES PARRY ISLAND
DO NOT USE WOOD EXCELSIOR.
To repack:

Close inlet and outlet valves.
Drain water from sump.

Drain remaining fuel into tank or to dry well.
Remove head flange and grid assembly.
Remove old filter and inner grid,
Clean out sediment and wood fiber.
Insert new packing.
NOTE:

The amount of packing supplied by the manufacturer

is the correct amount for the unit.

If there is any

packing left over or if the space is not entirely filled,
remove the packing and repack,
The packing should be installed or inserted in layers

of 4 inches to 6 inches until allof it is in position.
The packing must be placed evenly throughout the dehydra-

tor; otherwise "channelling" will take place and the fuel
will not be properly dehydrated.

Under no circumstances

should there be any open spaces after the packing has
been placed,

Replace front grid assembly, head gasket, and
head,
Use a suitable sealer on the gasket to assure

a tight fit.
2-9

Select target paragraph3