Mr. Joe B. Sanders
Subject:

,

Taongi Atoll - Construction and Support Requirements

30 January 1957

Page 4

Because Of the meager information available to us with respect to large vessel
operations off the Taongi Atoll it seems logical that a representative of the agency
that will furnish the support vessels accompany our first reconnaisance party. The —
method of operations and the support that we may expect can thereby be determined
more realistically.
Construction Schedule.

For the minimum scope of work contemplated it is estimated

we will require 65 construction and 35 operation personnel for a period of 6-1/2

months. The maximum scope of work will require 120 construction and 80 operation
personnel for a period of 7-1/2 months. These schedules cover on-site construction
only; a minimum of four months must be added to these schedules for procurement
and shipment of material and equipment. In estimating the time schedule it has
been assumed that the topography of the proposed airstrip site will be similar to
that of Nan and that beaches for landing craft, coral deposits, trees, underbrush
and other conditions will be similar to those of other atolls in which we have operated.
Cost Estimates. The items of work contemplated and the cost estimates are summarized
in the following tables:
.
Minimum Requirements
ITEM

l.

2.
3.

;

ESTIMATED COST

Beachhead

12 ,000

Camp (As Fox-Redwing)
Access Channel - 20' Deep

325 ,000
686 ,000

hk,
5.
6.

Concrete Station (As Station 70 - Redwing)
300' Steel Tower (As Station 5 - Redwing)
Five (5) Barge Anchorages

295,000"
343,000 _
222 ,000:

8.
9.

Submarine Cable
Seadrome

200,000
96 ,080

7.

Inter-Atoll Communications

TOTAL MINIMUM CONSTRUCTION

243 ,000:

.._2p422 ,000..--

RECAPITULATION

et

Construction Equipment

471,340

Operational Equipment

35 ,000

Construction Projects

2 ,422 ,000

TOTAL

2 928 , 340

Maximum Requirements
ITEM

i.
2.

3.
h,
5.

ESTIMATED COST

Beachhead
Camp - 200-Man

Airstrip
Access Channel - 20'

.

3 Concrete Stations as Redwing

.

Pe

,

*:

12 ,000
450 ,000

560 ,000
686 ,000

1,013 ,O00