65

Appendix B — Tables of Relevant Facts

sCIENTIFIC AFTER ACTION REPORTS/INVESTIGATION (SAARD

14.2
104.6

National Academy of Science (travel)
Army Engineer Core Sampling (Cactus Crater)

289.5

National Academy of Science Contract

Soil Sampling, Sediment and Water

271

Analysis (LL)

435.

Total SAARI Costs

18,177.

Total Obligations as of 6 March 1981
MILCON Appropriations

20,000,

Balance (at the time when all accounts are closed,
will be returned to the Treasury of the United States)

1,822.

b. Base Camp Expansion O&M Costs

(1) FY 76 ($ to the nearest hundred) ................. $ 558.
Warehouse renovation
Rehab Chapel

Replace Roof (fresh
water tank)

Repair and clean sewer

Repair and Install
Generator

Repair and Install Salt

Water Pump
Complete Electrical

$12.4
4.5
9.6

17.5.
11.4
6.6

Distribution
Replace Cold Storage
Building
Air-Conditioning &
Exhaust Bldg 462
Repair Consolidated

27.0

Rehab Building 462

17.5

Maintenance Shops

Repair Garbage Pier

22.8
6.0

23.1

Repair POL Lines
Buyandinstall Aqua

Chem Units

Repair Cargo Pier

Rehab Carpenter Shop

Replace Personnel Pier

Activate Fire Protection

System

Rehab Foamite Pump House
Rehab POL Storage System

Repair Fresh Water
Dist System
Repair Salt Water Dist
System
Repair POL Liners
Rehab Building 643

Rehab Mess Hall (Phase I)

2.

73.

21.

2

45,
20.

1.
40.

67
63
20
17

20

4.)

(2) FY 76T .. oc cccccccccccc cece ec e nee e cena eens 115

Select target paragraph3