r

Y

Appendix B — Tables of Relevant Facts

647

FIELD CONSTRUCTION(Cont'd)
Enewetak Camp Expansions

400-gallon Aqua Chems (3)

OPLAN Building
Modifications
Electrical Modifications
Installation of
Generators/Aqua Chems
Lens Well and Pipeline
Laundry Facility
Latrine Building 19
JP-4 Discharge System
Detention Facility
Install Trailers
Install Reefers
Reproduction Room,

164.1
267.7
10.1
37.7
18.2
76.6
13.4
17.5
$.3
8
15.6

Building 15

7.7

Women’s Quarters
~

11.1

1586.9

Lojwa Base Camp Construction

Material (Army

Requirements)

Salt Water Pump Station
MessHall
Latrine Trailers

600-gallon Aqua Chems (4)

Navy Momatfor Beaches

645.8

1051.6
27.1
219.9
10.1

278.2

28.1
3207.6

Total Field Construction Costs
CLEANUP
Dri-Enewetak Labor
Johnston Atoll Personnel Assistance
Field Command Surface Shipments
MSC Surface Transportation

Field Command Air Cargo

MACAir Transportation (routine)

MACAir Transportation-Typhoon Alice
Oakland, CA, Army Base-Packing and Crating
Commercial Air Cargo

13.5
11.3
2.6
1965.4
5.1
2194.0
56.2
19.2
12.4

Select target paragraph3