ENGINEERS

tO.

Resident Engineer

FROM:

L. 5. Hammond

jon.

884

_

xe._Survey Records_

.
pate.__May2451954

Referring to your HN 1533 it 1s important that this office have sufficient infor

mation available on the

survey methods used and accuracy obtained in the

positioning of stations 10, 30, 40 and 90 to assure efficient future design

and to answer any questions of tha client in this regard.
mation should be sulmitted for this purpose.

The following infor

(1) Summary of methods and procedure for each of the four stations.
(2) Analysis of the results of positioning by intersection of theodolite

angles.

This should include the coordinate relation of each theodolite

position check from which the mean or final valves of a station wera obtained,

(3) Copies of field notes and computations related to the positioning of
each station,
(4)

Copies of field notes and computations of any expansion of primary

horizontal accomplished to provide local control for positioning of these stations,

(5) Copies of the results obtained by any observations to determine the

yaw, roll, pitch and horizontal motion of a station around a fixed point.

Item (1) 1s required as soon as possible for inclusion in the narrative portion

of the survey seation of the completion report. The remaining items should be
sutmitted as early as the information can be compiled as some of this information
may be inoluded in the report.

oe

BEST COPYAVAILABLE
NWATIOVAL ARCHIVES

REPOSITORY L4C/Fic sou THWES TT KEG ION
COLLECTION AG 366 ATOMME EMEKGY Cortit[sSiOW

BOX No. 129664 608) Al633q
SU Ve VS

FOLDER 2WE%T 4 1953 OW

LSH; vr

ect

{

Project Manazer, o/s
\
LS, Hanmond
Project Engineering File
Sentral Pile (2)
Engineering File

|

326-65 yoI?e

: