6.

SURVEY TASK GROUP ORGANIZATION.

DON, DOE and —

resources dedicated to the accomplishment of the R

Survey will be organized into a Survey Task Group
a.

Project Manager.

COMPMTC was designated

I

iiological

3 follows: oject

Manager for logistics support to the subject survey in CNO msg
010007Z APR 78 and will continue in this capacity t nrough
project completion, coordinating and providing, on behalf of
DON, all logistics Support required py DOE for the AcCcOMm~
plishment of survey objectives.
b.
Aerial Photographic Task Element.
The ottkcer in
Charge of the EC-121 aircraft detachment will repor
for
Operational control directly to the Project Manager tor the
conduct of Phase I of the survey, and will function as the
Primary point of contact for the DOE designee havin gy technical
direction responsibilities for the conduct of Phase I of the
survey.
Cc.
Aerial Radiological Task Element.
This tab k Element
r
will accomplish Phase II of the survey utilizing US WS WHEELING
(TAGM-8), assigned helicopters and associated suppo re per-

sonnel and equipment.

(1)
Logistics Support Task Commander.
E
USNS WHEELING (TAGM-8) will be a Logistics Support
Commander (LSTC) who wili function as the primary p
contact for the DOE representative exercising techn

barked in
ask

int of

cal

direction responsibility for the conduct or Phase I of the
survey.
The LSTC will have overall operational con rol and

Management responsibility for DON provided logistic
Support.
logistics
DOE representatives will channel requests for surve
support through the LSTC who will then coordinate t e efforts
of

the

USNS WHEELING

(TAGM=-8)

and

the OINC of

the h

licopter

ponsor
detachment.
The LSTC is further designated as the
Designated Representative (SDR) as defined in refer nee (a).

roject
(2)
PMTC Technical Representative.
The
Manager will designate an embarked PMTC Technical R presentative who will act as primary advisor to the LSTC n logistics Support matters.

The PMTC Technical Represent tive will

assume the functions and responsibilities of the LS C/SDR in

his absence.

(3)
Master, USNS WHEELING (TAGM-8).
The ship's
Master will have absolute authority and responsibil ty for the
safety of his ship and embarked personnel as prescr bed in
reference (a) while responding to the operational rc quests and

recommendations of the embarked LSTC/SDR.