"The meeting was opened at 1300 hours, and the items discussed
were those shown on the preceding sheet.
"Captain Staley is to forward minutes of the meeting to Holmes &
Narver, PARRY Island, as soon as possible for record purposes.
A brief resume of the items discussed which affect Holmes & Narver
are as follows:
"For the purpose of over-all planning and an approximate determination of the length of time that the LST will be required, Captain
Staley suggested that we assume that plans and funding would be
approved by 1 November 1956. Onthis basis we discussed the time
necessary for the several operations involved with the following
general conclusions.
'"(A)
50 days
For LST movement (carrying materials) from ZI
to PARRYIsland.
2l days
-
For prefabricationat PARRY Island and loading
of LST.
90 days
-
For construction (possibility of being reduced to
60 days).
l6l days
-
Total
25 days
-
Return of LST from PARRYIsland to ZI.
186 days