PROPOSED AGREEMENT BETWEEN

(

G

en_ 8

TEST DIRECTOR AND SCIENTIFIC DIRECT

409463

The Scientifie Director request that the following general regulaticns

be approved by the Test Director, AEC, for the bomb tests in 1948,

R

It ccems vory

desirable to have these minimum regulations agreed upon early in the operation
in order to avoid misunderstandings and, possibly, hard feelings.
1.

Only the Sefentific Director in person may press the firing button

Many other officials, ex officio, may veto firing at any specific time or under

All technical operations, experiments and observations are to be
The approval in

13 — 007}

It has been agreed already

This paragraph merely stipulates that the

Test Director, although retaining the authority to refuse to permit any given
experiment, or to order abandoning a previously approved experiment, himself,
also delegates the same authority to the Scientific Director.

This means that

in any case of nonresolved disagreement between the Test and Scientific Directors
on whether or not to do a given experiment, the experiment will not be done,

The details as to how an approved experiment is to be done lie wholly within the
jurisdiction of the Scientific Director,

If the Test Director disagrees with the

*Except as specified for — Case I, Item 7, below,

we NARA-College |

jurisdiction of the Test Director,

tack.

with the Task Force Commander that all technical operations will be under the

au ye nee

observations aided by such accessories as binoculars.

St wath ee

U.R. Schodt

ROVIEWEO Sy

bomb explosion within a radius of twenty miles, except simple sensory

Fe

3

taken or any equipment of whatever nature set up or assembled to make any

observation of the physical, chemical, biological or other effects of the atomic

CarlWils eas.

atefal

BY
AGPTeenapape
oye
BY
prt t
AU
THOS Ty op
UL
OG

is

DAT

\

Xv

Technical Director must be obtained before any propesed experiment may be under-

BOX No.

writing by the Technical Director, the Deputy Technical Director or the Assistant

COLLECTION RG 326

done under the direct cupervision of the Technical Director.,*

cv.?a

2.

BEST COPY AVAILABLE

109 WN3-32%4> -

E
Wiles bY aw Taek ena

Safety, etc,

- - “oY

specific conditions, e. g., the Test Director, the Director of Radiological

~

present, in which case this duty devolves upon the Deputy Seientific Director.

46-5! SéretarFOLDER Y7-6 (yf 21-47) Sandstone Vol. /

or give consent or order to have it pressed unless he is physically unable to be

Select target paragraph3