Eos cx, ADYU 2224 UNCLAS FOR REmpSieses
_”

Oy 2ee ay APG ya

ME coos epg PERIODIC MEDICAL-ECOLOGICAL STUDIES OF THE POSSISLE EFFECTS
Boo: TALLOUT ON RONGELAP ATOLL. WAVY WILL PROVIDE LOGISTIC SuPPORT,
ON A REIMBURSABLE BASIS TO THOSE AEC AND AEC CONTRACTOR REP RESENTA~
TIVES MAXING SUCH USE OF THE LABORTORY AND STAGING SUCH STUDIES.

4. AEC AGREES TO PROVIDE A PERIODIC RADICLOGICAL SURVEY OF EPG AND TO
ADVISE THE NAVY OF RADSAFE PROBLEMS IN THESE AREAS SO AS TO PROTECT
THE GOVERNSENT OF THE UNITED STATES. COSTS FOR SURVEYS SPECIFICALLY
ann

REQUESTED BY DOD WiLL BE BORNE SY DOD.
5. PENDING A DETERMINATION BY AEC AS TO THE CONTINUANCE OF THE
“AEC FACILITIES DIVISION, H2N, INC LOS ANGELES (THE AEC PRIME
OPERATING CONTRACTOR FOR EPG) AEC AND NAVY WILL, EFFECTIVE JULY I
"1986, EACH ASSUME AND PAY AN EQUITABLE SHARE OF THE OVERHEAD cost
OF SCH DIVISION, THE COMMANDER, PACIFIC MISSILE RANGE FOR NAVY

Sy

AND THE MANAGER, ALBUQUERQUE OPERATIONS OFFICE FOR AEC WILL

-

IMMEDIATELY UNDERTANE TONEGOTIATE A MUTUALLY SATISFACTRORY WSTHOD
OF APPORTIONING AND PAYING SUCH COSTS. THE RESPECTIVE aEC AND
NAVY PRIME CONTRACTS WITH HOLMES AND NARVER WILL APPROPRIATELY
“REFLECT THE YETHOD OF ALLOCATION OR APPORTIONMENT OF SAID COSTS
AS BETWEEN THE NAVY AND AEC. THE FINAL ALLOCATION AND SETTLEMENT
'

_

OF SAID COSTS AS BETWEEN NAVY AND AEC SHALL SE ON THE BASIS 6
RETROSPECTIVE DETERMINATION INCLUDING APPROPRIATE ADJUSTMENTS.

2) 08/933 r/ ford!

_

Select target paragraph3