26 Sept. 61, J-6 Report: Since the kickoff of test preparations and testing ———————— on 31 Aug. the following requirements have been laid on J-6: 1. Preparation of U-3 ac at 332 ft. depth for the 2. Preparation of U-3 aa at 340 ft. depth for the 3. Drilling and casing of U-3 ae to 665 ft. depth for the 4. Drilling and casing of some 12 more shot holes ranging in depth from 800 ft. to 2000 ft. Scarab. BY Scarab. Tsetse. The most optimistic schedule says that these will be completed by 1 Feb. 62. 5. Drilling of a 2500 ft. deep core hole in Area 4: 6. Drilling of a 6000 ft. deep core hold in Area 15. 7. Design of a "flying" alpha station to be located at the top of the holes which will save on coax cable. 8. Rad chem sampling and down hole hoisting cable assemblefor the first five shots by Zia. 9. ~ Preparation of cams and alpha detector racks for the first five shots by Zia. . WI /7Several other specific items involving the design and construction and placement of instrumentation as well as procurement of certain items such as ibling and connectors. J-6 adds “It is readily apparent that if Area 7 balloon-type testing and vivetok testing is mounted, either J-6 will have to obtain more people or pull vem from Rover." J-6 is also sepporting very actively some local activity as ‘l] as plenty of activity in the Rover program. By