Minutes of NTS Planning Board Meetings Beginning with

the 13 September 1961 Meeting

The following notes cover the recommendations from Mr. Reeves of NVOO
and the pertinent notes from each of the Planning Board meetings by

meeting date:

a3 September 1961 - In addition to the information and conclusions and

.recommendations coming out of the meeting Reeves provides Gen. Betts with
the following information:
(1) that preliminary planning in connection
with reopening the EPG has been initiated and that a 21 September meeting
between LRL, LASL, Sandia, Holmes § Narver and Reeve's office will be

held in Los Angeles to develop an integrated approach to the Eniwetok

requirements such as balloons, barges, towers, cabling, etc.
Further,
that a preliminary report should be available in about 3 to 4 weeks after
a small survey party from H @ N visits the Eniwetok facilities which is
hoped to be immediately.
(2) that ALO is presently working on the budget

for the upcoming NTS program and that cost estimates are being prepared
and should be submitted to DMA and appropriate authorities prior to 20
October 1961. Following are the specific notes on the Planning Board
discussion by item discussed:
events;

(1)

a review of DMA, LASL, LRL proposed

it was concluded that it was unrealistic to attempt to firm ud

a schedule for any period longer’ than 4 months and that such @ schedule

should be considered very tentative.

Comments were made on the short-tera

schedule which would cover the operational pericd for Nougat through

‘February 29, 1962 only.
It was recommended that an additional operational
period and title be established for the period beginning 1 March 1962.
The events, sites, general readiness period and details of each shot were

tabulated for the period beginning March '62 and were stated to be very
tentative. It was recommended that Presidential approval for special material
‘expenditure for Nougat should be in gross figures rather than being related
to specific events. The LASL schedule was stated to be based upon a concept of two events per month following the first four events in Nougat.
Beyond that four event period device readiness would probably influence the
schedule as well as site readiness.
It is further stated that an NTS mining
and drilling capability must be achieved to meet the present planned schedule
and that after attainment it should be maintained regardiess of delay or
interruption in test schedules. As for events and experiments in addition

to the short term Nougat scheduie the foilowing were noted:

an experiment

in Dolomite is vital to engineering the high yield sites in the Ul2e and 2
complexes and such an experiment snould be done as soon as practicable and
should be included in the mid-range program; two Plowshare cvents per yeur
could be accommodated in side drifts of the Ul2b-e or g tunnels as a rather

small] addition to the schedules and the Plowshare Wagon event would be accommodated in Area 18. The philosophy for DoD experiments with the exception of
Hard Hat and Marshmellow was that they would not be considered

in an integrated

fashion by the board but would be approved at the Washington level and integrated
into the schedules at the field level. Discussion item(2)was to consider the

DoD experiments; the board gave attention to the Marshmellow and Hard Hat

!