Box 289 the13 Sept. 61 meeting, on which I have taken notes elsewhere. 3 Here are the minutes from the NTS Planning Board Meetings beginning with “4 Here is a TWX covering the 27~28 Sept. meeting from Reeves to the NTS contractors which notes certain guidance to be used by the contractors in preparing costs estimates. The Dolomite event is to be shifted to the mid-term program. The I, J, and K tunnels in Area 12 are to be prepared for,yields and readiness dates of Dec. 15 for K, Jan. 15, 62 for J, and Mar. 62 for I. Here is record of a phone call from E. Bowen of H&N to Sherman Sullivan in Los Angeles on 13 Sept. 61 wherein H&N proposed to make a study of what it would te —— Te ——77 take to reactivate Elmer and Sullivan told him that while he felt such a study f 139 “6i* would be highly desirable, political considerations might preclude doing this. Sullivan spoke with Rex of ALO and got agreement that the presence of H&N personnel e discuss doing a physical survey might trigger unwanted speculation and Rex would this with Reeves. Finally authorized was a small sum of money for:a preliminary study to be done in Los Angeles on this subject and to be accomplished"discreetly." Sullivan was head of the Los Angeles Branch office of the AEC.