the assumed production rate of presently authorised. facilities,

‘and oralloy output by 150% ef presently enthorized facilities.

*

*

.

8

(approved
1/17/52)
:
e
|

:

~~oablished

Gre Recuirenerta.
ts. “@re procurenmt
nt goals have|been osare believed to be obtainable which will

|

4operation, aut in additionmy perait oore
re stockpiling

¥
Bi

Commission. (Subsequently, on. September 16, 19
that they have establishedan ore
oreFrovurenent, goal of

_ tone af uranium ore per years)

Le

ates

the
500

:

Pactlitieg.'

able mterials producti will require the constructionjaf new

facilities as fallowes

ake
2

so

oo,

2. Expanding ancillary facilities for the process-

twW ee
Weapons
.
.

Construction for the expansion program should [be ecapleted by Jamary 1957 provided the necessary materials
man~
power are made available on sahednile for ths currently
ed
atomic energy program as wellas for the facilities set arth above.
osts, “the expansion program is roughly estinated to re-

quire a
900,000,000 in canstruction costs ani willl result in
on ostinsted fnarenental amma) operating cont ef $700,(60,000 when

the new facilities are completed.

(approved by letters from tha President totheGhadraan, ooant

the Director of Defense mobilisation, dated 2/25/52)

|