VOL, Il BOOK 6 2, CHAPTER Il SECTION 2 All shutters were locked in open position Blidg, 90 - Air Task Force Group Headquarters: 1, All doors were removed 2. All shutters were locked in open position Bldg. 91 - Alert Crew - Crash Truck: 1. All shutters were locked in open position Bldg. 92 - L-13 Operations: 1. All doors were removed 2. All shutters were locked in open position Bidg. 94 - POL Pump House: 1, All doors were removed 2. All shutters were locked in open position Bldg. 117 - Five NRDL Buildings: 1. All doors were removed 2. All shutters were locked in open position Bldg. 84 - Power Transmitter: 1, All doors were removed 2. All shutters were locked in open position Bldgs. 72, 135, 507, 508 - Supply Office; Drone Crew, briefing and Operation; Hobby Shop; Library, respectively: 1. Buildings were opened up 2, Longitudinal walls were braced 3. Line of supports was provided for 2nd floor beams 6-43