VOL.

BOOK 6
2.

Cable bracing was provided

3.

Vertical roof support was provided

CHAPTER II

SECTION

2

4. End wall facing blast was braced
5. Additional securing studs were driven in sill plate angles
Bldgs. 5, 6, 7, 8, 17, 109, 110, 111, 112 - 9 Buildings:
1,

All shutters and doors were locked in an open position

2.

Support for roof in shower room was provided

3. Additional securing studs were driven in sill plate angles
Bldgs. 10, 11, 12, 13, 18, 19, 20, 21 - 8 Buildings:
1. All doors were removed
2,

All shutters were locked in an open position

3. Lockers were laid flat
Bldg. 15 - Group Headquarters:
1,

All doors were removed

2.

All shutters were locked in an open position

Two full height panels were removed from the wall between the
south and the central sections
Bldg. 16 - Post Office and Post Exchange, with 3 Wings:
1,

All doors were removed

2,

All shutters were locked in open position

3, Sliding door was locked in open position
Bldg. 23 - Hospital Ward:

1.

All doors were removed

2,

All shutters of the east and west walls were locked open

6-39