Bldg. 302 - Laundry, and Bldg. 303 - Boiler House:
1.

Doors were removed

2.

All shutters locked in open position

3.

Roof supports provided for wing to Bldg. 302

All loose items on shelves and any breakable items in the laundry were put
in boxes, placed on the floor and covered with canvas, All installed equipment was covered with canvas.

Bldg.

308 - Food Warehouse:

1, Locked sliding doors in open postion
Locked all shutters in open position
Stored supplies below level of windows

Additional securing studs were driven in wall sill plate angles

_
*

Bldg. 309 - Materials Testing Laboratory:
Locked all shutters in ppen position and removed doors

Bldg. 311 - Control Building:
All doors were locked in a closed position
End walls were braced

Building was braced
Additional securing studs were driven in wall sill plate angles
329 - Laboratory:
Exterior doors were locked in closed position
North wall was braced
Roof support was provided.

See Figure 6-8.

Pins were driven at wall sill plate angles

6-34