VOL. BOOK 6 CHAPTER Il SECTION 2 Bldg. 302 - Laundry, and Bldg. 303 - Boiler House: 1. Doors were removed 2. All shutters locked in open position 3. Roof supports provided for wing to Bldg. 302 All loose items on shelves and any breakable items in the laundry were put in boxes, placed on the floor and covered with canvas, All installed equipment was covered with canvas. Bldg. 308 - Food Warehouse: 1, Locked sliding doors in open postion Locked all shutters in open position Stored supplies below level of windows Additional securing studs were driven in wall sill plate angles _ * Bldg. 309 - Materials Testing Laboratory: Locked all shutters in ppen position and removed doors Bldg. 311 - Control Building: All doors were locked in a closed position End walls were braced Building was braced Additional securing studs were driven in wall sill plate angles 329 - Laboratory: Exterior doors were locked in closed position North wall was braced Roof support was provided. See Figure 6-8. Pins were driven at wall sill plate angles 6-34