Posts were installed under frames where columns were omitted.

See Figure 6-6 on the following page.
7, Additional securing studs were driven in wall sill plate angles
Bldg. 313 - Warehouse and Supply Office:
1,

Sliding doors were locked in open position

2, All shutters were locked in open position

3, All filing cabinets were laid flat
4,

Pins were driven at wall sill plate angles

5.

Materials were stacked against outside walls and a center support
for roof provided

Bldgs.
1,

314, 315, 316 - Shops:
Hinge-type doors were removed and sliding door was locked in
open position

2. All shutters were locked in open position
Bldg. 317 - Carpenter Shop:
1,

All windows were locked open

2,

All equipment was covered with tarpaulins

Bldg. 322 - Marine Motor Repair:
1,

All shutters were locked open

2.

All equipment covered with tarpaulins

Bldg. 410 - Salt Water PumpStation:
1,

All doors were removed

2. All shutters were locked in open position

3. Instrument panels were braced