VOL, U
BOOK 6

CHAPTER II
SECTION 2

3. Vertical supports for roof were installed
4, Additional securing studs were driven in wall sill plate angles
Bldg. 216 - Library and Day Room:
1.

All doors were removed

2.

The shutters of end wall facing blast were removed and all others
were locked in open position

Bldg. 221 - Task Force Building:
1, All doors were removed
2. All shutters were locked in open position

Bldg. 222 - Security:
1. All doors were removed
2.

All shutters were locked in open position

Bldgs, 227, 228, 233, 234, 235, 236 - 6 Buildings:
1,

All shutters were locked open and doors were removed

2. Support for roof in shower room was installed

3. Additional securing studs were driven in wall sill plate angles
Bldg. 232 - Scientific Users Shop Building:

1. All doors were locked closed
2.

Braced end wall facing blast

3. Supports for roof were installed

4,

Cable bracing for middle 24 feet of wall facing blast was installed

5. Additional securing studs were driven in wall sill plate angles
Bldg. 237 - Recreation Building, Bldg. 409 - Beer Hall:
l.

All doors were removed