VOL. Il
BOOK 6

CHAPTER II
SECTION 2

BLDG. 118 - Infirmary:
1,

All windows were locked open

2.

Additional securing studs were driven in wall sill plate angles

Bldg. 120 - Barracks:
1.

Wood section was opened up

2.

Supports for rafters at center line were installed

3.

All doors were removed

4.

All shutters were locked in open position

5.

Lockers were laid flat

6.

Upper shutters were removed on end wall facing blast

Bldg. 122 - Barracks:
1.

All doors were removed

2.

All shutters were locked in open position

3.

Upper shutters were removed on end walls

Bldgs. 124, 126, 128, 129 - Barracks
1,

All doors were removed

2,

All shutters were locked in open position

3.

Lockers were laid flat

4,

Upper shutters were removed on end wall facing blast

Bldg. 194 - New Machine Shop:
1.

Door was locked in open position

2, Cable stays were installed in wall facing blast. See Figures 6-2
and 6-3 for method
3, Vertical supports were installed for roof
6-25