CHAPTER I SECTION 1 VOL. I BOOK6 Hq.TG 132.1 1200 * 1230 Hq. TG 132.1 1230 LSU, Gene to Elmer, carrying last portion of Motor Pool. H&N 1230 Two LCM's, Elmer to USS COLLINS (Evacuation Boat). Hq. TG 132.1 1230 LCM, Elmer to MSTS SHANKS(Evacuation Boat). H&N 1230 LSU, Elmer to MSTS SHANKS (Evacuation Boat). J-1, TG 1230 Each TG 132.1 muster and sub-muster officer will muster (by sight) those persons for whom he is responsible and report to the J-1 representative at his location no later After this time no personnel will be allowed to leave ships unless their names are on appropriate access lists to be issued by CTG 132.1. Removal completed and all equipment loaded in DUKW. Mr. Sugden and four telephone repairmen return to Elmer with DUKW via LSU, then proceed aboard ship for evacuation as soon as possible. than 1300 hours. This report will consist of a signed muster list with those personnel mustered indicated thereon. Hq. TG 132.1 1230 H&N 1300 NRLS 1300 LCM, Janet to Tilda to Elmer, transport jeep from each station to Elmer, total of two jeeps. J-1, TG 1300 Each local J-1 representative of TG 132.1 will report to the Task Group muster officer aboard the MSTS SHANKS,utilizing the most expedient method of communications available. Hq. TG 1300 LCM, Elmer to USS RENDOVA(Evacuation Boat). 1300 TG132. 1 personnel scheduled for evacuation to USS RENDOVA commence embarkation. (Loading must be completed and all LCM, Elmer to MSTS SHANKS(Evacuation Boat). LCM, Yvonne to Elmer, carrying airport jeep and 1-1/4-ton trailer. personnel must be on board ship by 1700, M -1 Day.) *Communications 6-7