VOu BOO e CHAPTER IV SECTIONS 2] -22 connecied iv a new 5i-pais telephame cable to Site Flora, terminating in Station 5 for use by EGG. Four coax lines furnished by EGG were installed from Stations 5 up the television tower, Station 6 on Site Flora. Television and radio antennae and mounts were installed on Station 6 under User supervision. Until M -1 Day, a hoist and operator were furnished in Station 6 by Holmes & Narver, Air conditioning was re-installed in Station 1002 on Site Elmer. Fans were furnished prior to re-installation. In addition to existing wire installation, two pairs of timing wires were furnished and installed between Station 1002 and the photo tower, and four pairs were furnished and installed between Stations 1002 and 302. In the old control tower compound on Site Elmer, an antenna pole was erect- ed, 50 feet from Station 1020 and at a bearing of 345° from this station. A light-weight antenna, furnished by EGG, was strung between the new pole and Station 1020, hardware and labor being furnished by Holmes & Narver. Man hours totaling 1114.5 were charged to Project 10.1 support. PROJECT 10.2. Labor and material were furnished to install and connect the radio in Bldg. 311 and to install an antenna. The antenna was removed after KR-Day. A 2-foot wide platform was constructed and installed on Station 1020. The platform had a safety railing around it and was capable of bearing a load of 400 lbs. Involved man hours in support of this project totaled 53. SECTION 22. PROGRAM 11 PROJECT 11.1.. To perform work outlined by the Home Office on 8 May 1952, 14 location targets were constructed in accordance with Field Sketch 735. One Type I target was erected on the water tower at Site Gene; another on the '"Multistory Building" on Site Janet; a third on the photo tower at Site Mary; two Type ll targets on the reef south of Site Alice; and one Type III on each of Sites Alice, Belle, Clara, Daisy, Flora, Irene, Kate, Lucy, and Olive - or a total of nine Type Ill targets, Exact locations and orientation were staked by the Survey Department of the Holmes & Narver Engineering Division. All 14 targets were later decorated with bunting for easier locationfrom seaward. A general open work order provided for equipment, supplies and personnel to be furnished as required for the support of the Project 11.1 hydrographic surveys. A total of 447 man hours was involved. PROJECT 11.2. Location targets were installed off the southeast corner of Site Flora, in accordance with User's sketches. On Stations 69, 132b, 11, and 13, simple ventilating systems were installed, consisting of 6-inch-diameter sheet metal pipe with scoop pointing into the wind, and extending several feet into 5-26