VOL. BOOK 5 CHAPTER IV SECTION 15 secured to 6"' x 6" wooden members. Shortly thereafter, transportation was provided by LCM boat for User personnel to recover films from the ''Oscar" Site. STATION 300 - PROJECT 3.1. In accordance with detailed instructions, Holmes & Narver furnished material and installed shelf brackets for mounting a teletronic camera at this station. STATION 301 - PROJECT 3.1. Materials and electricians were furnished to reactivate light and power outlets, and to assist EGG in installing instrumenta- tion in this station. STATION 302 - PROJECT 3.1. Holmes & Narver installed lights and duplex outlets in Station 302 and provided 1 KW of 100 volt single-phase power to the station. Light and power outlets were reactivated and assistance was provided to EGG in installing instrumentation in the station. and operator were supplied as required by the User. The services of a crane Aiming points were in- stalled about 20 yards in front of each of the six cameras used at this station. At each aiming station a light socket was installed and wired-in to an outlet at Station 302. Following M-Day, the camera shelter was removed and stored. STATIONS 303 - 305. PROJECT 3.1. Materials were furnished and electricians provided to reactivate light and power outlets, and assistance was rendered EGG in the installation of instrumentation at these stations. The services of a crane and operator were supplied as required. The camera shelter at Station 303 was removed and stored after K-Day. STATION 306 - PROJECT 3.1. The services of a crane and operator were furnished to place instrumentation at this station, Following K-Day, the camera shelter was removed and stored. STATIONS 307 - 308. PROJECT 3.1. Materials were furnished and electricians provided for the reactivation of light and power outlets. A crane and operator were furnished for the User's requirements, Following M-Day, and in preparation for K-Day, the two outer camera shelters at Station 307 - weighing 1-1/2 tons each - were interchanged and eight mounting holes were drilled and tapped in each shelter base to accommodate 3/8 inch bolts. Joints of the camera stand at Station 308 were welded and the stand was secured to the concrete pad on which it rested. Prior to K-Day, the frame of Station 308 was shifted on its base and re-secured, in accordance with the User's directions. STATION 309 - PROJECT 3.1. Following M-Day, wiring was installed at this station to furnish 1.5 KW of 110 volt, single-phase power. STATIONS 1001.01, 1001.02, 1001.03, 1002 - PROJECT 3.1. Wooden work benches were fabricated and installed in these stations. These benches, approximately 26 inches wide and 40 inches high, were located inside the main 5-15