QUAN.} UNIT 4 Bach TOTAL COST II YVONNE "TOA q9T-L DESCRIPTION OF PROPERTY UNITS STATION NOS. 6101.01 THRU 6101.04 A reinforced concrete cube 1'-6" x 1'-6" x 1'-6" with one embedded conduit furnished by the User. (No installed equipment. ) Construction Contract Cost Engineering Cost 1,069.39 3.38 1,072.77 JANET STATION NO, 6103 E.C.0. 3703 authorizes the construction of this station, a reinforced concrete cube, 1'-6" x 1'-6" x 1'-6", with one embedded conduit furnished by the User. (No installed equipment. ) L Each l System No Costs YVONNE Timing cables, furnished by the User, installed in 36" trenches to Users’ equipment. Installed equipment: 1 - 5 KVA "Gregory" transformer, serial No. 5096226, H & N No. TR-62. XIGNGddvV STATION NO. 6140