UNIT 1. Kach vsose "TOA QUAN. TI DESCRIPTION OF PROPERTY UNITS ALICE STATION NO. 840 Three continuous "Unistrut" anchorages each 22'-O" long embedded in the concrete roof of Station 300. (No installed equipment. } Construction Contract Cost Engineering Cost 92.22 14.12 106 . 34 FLORA STATION NO, 841 A steel ladder, fastened to the exterior of Station No. 1, 62'-5-1/2" high, with one cross-over platform at the 31'-0" level. E.C.0. 3712 authorizes the construction of a 20'-0" high open wood frame tower, with an 8'-0" square wood decked platform on top and a 20 feet. (No installed equipment. ) Construction Contract Cost Engineering Cost 5 537.06 302 .96 STATION NO. 82 An open wood frame tower, 8'-6-1/2" square x 20'-0" high, 0.D., with LST 2 a 2" thick wood plank platform and a wood railing on top; erected on 1 Bach 5,840.92 XIGNaddvV 2" x kh" railing around, to support and raise the ladder an additional