DESCRIPTION OF PROPERTY UNITS

ALICE
STATION NO. 840

Three continuous "Unistrut" anchorages each 22'-O" long embedded in
the concrete roof of Station 300.

(No installed equipment. }

Construction Contract Cost

Engineering Cost

92.22

14.12

106 . 34

FLORA

STATION NO, 841
A steel ladder, fastened to the exterior of Station No. 1, 62'-5-1/2"

high, with one cross-over platform at the 31'-0" level.

E.C.0. 3712 authorizes the construction of a 20'-0" high open wood
frame tower, with an 8'-0" square wood decked platform on top and a
20 feet.

(No installed equipment. )
Construction Contract Cost

Engineering Cost

5 537.06

302 .96

STATION NO. 82

An open wood frame tower, 8'-6-1/2" square x 20'-0" high, 0.D., with

LST 2

a 2" thick wood plank platform and a wood railing on top; erected on

1

Bach

5,840.92
XIGNaddvV

2" x kh" railing around, to support and raise the ladder an additional