STATION NO. 804

A wood frame tower 12'-9" square x 34'-6" high O.D. containing three

floors with connecting ladder and hatches, centered on a reinforced

concrete base 16'-O" square x 3'-6" ‘thick.

The floor of the first

story is 1" T & G separated from the concrete base by redwood sleep-

ers; the second story, which is open to the weather, and the roof

are two layers of 1" diagonal sheathing, covered over by a built-up

composition roof decked over with 1/2" plywood.
third story is 2" T&G.

Flcoring for the

The first and third stories are enclosed

with two layers of 1" diagonal sheathing separated by 15 lb. paper.
Entrance is by a steel blast door at the first floor.

Total floor

area is 489 square feet, total volume of enclosed portions is 2608
cubic feet; includes all necessary electrical wiring and fixtures.

Installed equipment:

Each

1 - 50 KW "International-Harvester" portable

generator unit, serial No. UDR-22997, H & N No. G-63; 1 ~ 1/4 ton

"Wright" electric hoist, serial No. KA-6192, H & N No. TM-701; 1 generator unit, H & N No. G-64.

(The above list does not contain any user-furnished or user-installed

equipment. )

E.C.0. 292 authorizes the cutting of the first floor door and frame,

Construction Contract Cost
Engineering Cost

42,643.74.
3,408 .99

46,052.73

XIGNGddv

and the welding of a 1/4" steel plate to extend the door and frame
to an overall height of 7'-2".