II TOTAL COST "TOA qSTt-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BRUCE STATION NO. 804 A wood frame tower 12'-9" square x 34'-6" high O.D. containing three floors with connecting ladder and hatches, centered on a reinforced concrete base 16'-O" square x 3'-6" ‘thick. The floor of the first story is 1" T & G separated from the concrete base by redwood sleep- ers; the second story, which is open to the weather, and the roof are two layers of 1" diagonal sheathing, covered over by a built-up composition roof decked over with 1/2" plywood. third story is 2" T&G. Flcoring for the The first and third stories are enclosed with two layers of 1" diagonal sheathing separated by 15 lb. paper. Entrance is by a steel blast door at the first floor. Total floor area is 489 square feet, total volume of enclosed portions is 2608 cubic feet; includes all necessary electrical wiring and fixtures. Installed equipment: Each 1 - 50 KW "International-Harvester" portable generator unit, serial No. UDR-22997, H & N No. G-63; 1 ~ 1/4 ton "Wright" electric hoist, serial No. KA-6192, H & N No. TM-701; 1 generator unit, H & N No. G-64. (The above list does not contain any user-furnished or user-installed equipment. ) E.C.0. 292 authorizes the cutting of the first floor door and frame, Construction Contract Cost Engineering Cost 42,643.74. 3,408 .99 46,052.73 XIGNGddv and the welding of a 1/4" steel plate to extend the door and frame to an overall height of 7'-2".