TOTAL

COST

TI

QUAN.| UNIT

"TOA

QyT-L

DESCRIPTION OF PROPERTY UNITS
LAGOON
STATION NOS. 640.01 THRU 640.04

A wood framed and decked raft 24'-7-1/2" long x 15'-5" wide with 26
cil drum floats supporting a triangular wood and canvas framed lou-

vered and fins 10'-0" high x 10'-5" at the base, raft anchored in
Lagoon with Northill galvanized utility anchors.
(No installed equipment. )
Construction Contract Cost.

Engineering Cost

4

Bach

27,977.10

1,566.88

29,543.98

AS LISTED BELOW

STATION NOS. 641.01 THRU 641.04
A twenty foot high telephone pole, with painted black and white
stripes set erect in the reef.
Locations:

reef
reef
reef
reef

near
near
near
near

Janet
Ursula & Yvonne
Yvonne
Elmer

Construction Contract Cost
Engineering Cost

\
5,745 94
8.36

Each

5,754.30

XIGNAddV

Station No. 641.01
Station No. 641.02
Station No. 641.03
Station No. 641.04
(No installed equipment. )

Select target paragraph3